Prior Steps to building a Deck:
- Locate where you want to build your deck , each city , county has minimum set back from the property lines please check the regulation.
- Call 811 to have the city come out and locate if there is any utility line underground.
- Contact your Contractor to come out and do Measurements and go over details
- Submit a Building Plan
- once approved construction can begin 3 phase to complete a Brand New deck.
A. Footings are Approved
B. Framing Approved
C. Railings, Stairs Overall structure Approved
contact us
Prior step Building A shed /Studio
- Knowing your layout design, what will the shed studio be used for?
- Check with your city what are the property setback requirements, if a shed under the size of 150 S.F requires a Permit? If a Shed is under the requirement size than no building permit required.
- Will you be running power to your Shed ? Will You be running heat ? If yes to both you will most likely need a building permit. If yes to just Power , example : electrical outlets, light switch etc then a permit for electrical only.